Inspection is a necessary but non-value-adding activity whose purpose is to protect the customer from poor quality. We should therefore do as little as possible, upon condition that our inspection plan meets the customer’s requirement. Inspection plans with acceptance numbers of zero (c=0) minimize the sample size, albeit at the cost of a higher producer’s risk of rejecting lots at the specified acceptable quality level (AQL).
WHY SHOULD YOU ATTEND?
This presentation will show how to define c=0 plans whose customer protection is equivalent to that of the corresponding ANSI/ASQ Z1.4 (formerly MIL-STD 105) plan.
AREA COVERED
- How to use ANSI/ASQ Z1.4, including the definition of the sampling plan based on the inspection level, acceptable quality level (AQL), and lot size.
- How to use the standard’s switching rules to move between normal, tightened, and reduced inspection where appropriate
- Understand the benefits of double and multiple inspection plans in terms of their ability to accept good lots very quickly, and reject bad ones quickly, to reduce the average sample size.
- Convert any ANSI/ASQ Z1.4 plan into a zero acceptance number (c=0) plan that provides equivalent or better protection against poor quality at the rejectable quality level (RQL). (ANSI/ASQ Z1.4 plans do not have formal RQLs, but we pretend that the nonconforming fraction for which the consumer’s risk of acceptance is 10% is the RQL). A c=0 plan has a smaller sample size than any single, double, multiple, or sequential sampling plan.
- Nothing is free in industrial statistics, though, and the cost of less inspection is a higher producer’s risk of rejecting lots at the AQL. A c=0 plan should therefore be used only when quality is far better than the specified AQL.
- Generate an operating characteristic (OC) curve that compares the protection from the c=0 plan to that of the original ANSI/ASQ Z1.4 plan to gain the customer’s agreement for the use of a c=0 plan.
Attendees will also receive an Excel spreadsheet that shows the operating characteristic (OC) curve for a c=0 plan and compares it to the original ANSI/ASQ Z1.4 plan. Attendees can replace the example’s specification with their own.
WHO WILL BENEFIT?
- Quality Managers
- Quality Inspectors
- Quality Technicians
- Quality Engineers
- Engineering Departments
This presentation will show how to define c=0 plans whose customer protection is equivalent to that of the corresponding ANSI/ASQ Z1.4 (formerly MIL-STD 105) plan.
- How to use ANSI/ASQ Z1.4, including the definition of the sampling plan based on the inspection level, acceptable quality level (AQL), and lot size.
- How to use the standard’s switching rules to move between normal, tightened, and reduced inspection where appropriate
- Understand the benefits of double and multiple inspection plans in terms of their ability to accept good lots very quickly, and reject bad ones quickly, to reduce the average sample size.
- Convert any ANSI/ASQ Z1.4 plan into a zero acceptance number (c=0) plan that provides equivalent or better protection against poor quality at the rejectable quality level (RQL). (ANSI/ASQ Z1.4 plans do not have formal RQLs, but we pretend that the nonconforming fraction for which the consumer’s risk of acceptance is 10% is the RQL). A c=0 plan has a smaller sample size than any single, double, multiple, or sequential sampling plan.
- Nothing is free in industrial statistics, though, and the cost of less inspection is a higher producer’s risk of rejecting lots at the AQL. A c=0 plan should therefore be used only when quality is far better than the specified AQL.
- Generate an operating characteristic (OC) curve that compares the protection from the c=0 plan to that of the original ANSI/ASQ Z1.4 plan to gain the customer’s agreement for the use of a c=0 plan.
Attendees will also receive an Excel spreadsheet that shows the operating characteristic (OC) curve for a c=0 plan and compares it to the original ANSI/ASQ Z1.4 plan. Attendees can replace the example’s specification with their own.
- Quality Managers
- Quality Inspectors
- Quality Technicians
- Quality Engineers
- Engineering Departments
Speaker Profile

William A. Levinson, P.E., is the principal of Levinson Productivity Systems, P.C. He is an ASQ Fellow, Certified Quality Engineer, Quality Auditor, Quality Manager, Reliability Engineer, and Six Sigma Black Belt. He is also the author of several books on quality, productivity, and management, of which the most recent is The Expanded and Annotated My Life and Work: Henry Ford’s Universal Code for World-Class Success.
Upcoming Webinars


Stop Letting that Difficult Person Ruin your Day - Effectiv…

FDA's Technology Modernization Action Plan (TMAP) And Impac…

Nailing the Candidate Experience, Attracting Talent



Developing and Implementing Inclusive Leadership Strategies

Supervising a Human Error Free Environment: You can do a Lo…

Improving Organizational Performance through Enhanced Emplo…

Creative Leadership through Emotional (EQ) and Humor (HQ) I…

FDA's new Cosmetic labeling requirements

New Announcement! DHS Terminates The I-9 Form Remote Option…

Why EBITDA Doesn't Spell Cash Flow and What Does

Faster Payments in Today's World - Details on the Different…

Payroll Management - Tips To Make Payroll Processing Easier…


Ultimate Persuasion Strategies! - Secret Influence Tools & …

Introduction to Design of Experiments

Small Business Management Made Simple: Tools, Tips & Techni…

Design Control for Medical Devices and Combination Products

I-9 Audits: Strengthening Your Immigration Compliance Strat…


Employee Business Expense Reimbursement (2023 Updates)


Project Management for administrative professionals

Accounting For Non Accountants : Debit, Credits And Financi…

Establishing Appropriate Quality Metrics and Key Performanc…


Managing Toxic & Other Employees Who have Attitude Issues


Onboarding is NOT Orientation - How to Improve the New Empl…

Harassment, Bullying, Gossip, Confrontational and Disruptiv…

The Importance Of Documentation For Supervisors And Managers